a new industry standard for IPm software.….
The principal hurdle that LOF simulation had to overcome before it became generally accepted, arises because it is an interdisciplinary approach and requires input from a number of specialists. In particular, information is required from the following:
In addition, these disciplines not only have to provide information, they must also ‘buy-in’ to the approach.
However even in the face of these difficulties, LOF simulation is such a powerful technique for investigating the deliverability and behaviour of production systems, it was almost inevitable that it would eventually become the preferred approach. For examples of where FEESA has used LOF techniques to improve the design and understanding of production systems, please refer to the page on Case Studies.
Maximus has been designed with LOF simulation in mind and is therefore very efficient at performing simulations of this type. Of particular note is the speed of execution achieved by Maximus which is 10-100 times faster than other available software. For more details, please see the following examples:
Example 1 – Natural Depletion in a Three Well Development
Example 2 – Constrained Depletion in a Three Well Development
Example 3 – LOF Simulation of a Multi-Reservoir Development