Flow Assurance & Optimisation of Oil & Gas Production

Pipeline Warm Up

When production commences through an Oil & Gas production network, the system will initially undergo a transient increase in temperature.  This transient arises because the reservoir fluids are hotter than the ambient surface conditions.  Two example warm up calculations are presented here:

  Avoiding Hydrates

  Reaching Steady State

 