FEESA Home Page

WWW.FEESA.NET

Simulation Services
Optimisation
Maximus Software
Simulation Services
Case Studies
Research
About FEESA
Contact FEESA
Associations and Links


Flow Assurance & Optimisation of Oil & Gas Production

Dead Oil Displacement
Animated Gif (241K)

This animation shows results from a transient simulation of dead oil displacement of a deepwater multiphase flowline in the pressure - temperature plane. This operation was carried out in order to displace the live fluids from the flowline before they cooled into the hydrate envelope. The hydrate curve for this particular fluid is also shown in the animation. The dead oil is at 40°C and flowline sections filled with dead oil are shown in black, green sections are live fluids.

The animation shows that though the live fluids can drop to as low as 10°C, they are consistently >5°C away from the hydrate envelope.

Hydrate formation requires water, light hydrocarbon, low temperatures and high pressures. Though dead oil displacement may not remove all of the water, it does remove the light hydrocarbons and heats the flowline, making it a relatively robust hydrate avoidance strategy.

 

Home | Flow Assurance | System Optimisation |Maximus Software | Simulation Services |Case Studies | About FEESA | Research | Contact FEESA | Links

FEESA Home Page Copyright FEESA Limited ©. All Rights Reserved