Project summary

Woodside – Great Western Flank Development
Development of several Maximus IPM models for Woodside as part of a conceptual study of a 20+ reservoir gas development on the North West Shelf of Australia.  Numerous development strategies were investigated, simulating up to three compression platforms with tieback to existing field developments.  Models were validated against data from existing fields, and a new method for modelling the reservoirs and wells was developed and introduced.

ENI – Kashagan Development, Kazakhstan
Consultancy to the ENI/KDPC design team for the flow assurance design of the Kashagan development.  Developed operating guidelines and recommendations to focus future transient studies.

ConocoPhillips US – Malakia Study, Malaysia
Gas lift optimisation study using Maximus for a small development offshore Malaysia.