This
example shows a
Maximus model of a single well tieback
to a fixed platform. Oil
and gas are produced from a reservoir through a completion and
up a tubing string to the subsea production tree. Thereafter, the fluids flow through the jumper to a manifold
(for tie-in of additional future wells), along a 5 km export pipeline
and finally up a 100m riser to a fixed platform. The fluids are delivered to the slug catcher at a pressure
of 25 bara and the initial reservoir pressure is 300 bara. The initial flow rate is predicted to be about 14 kg/s
which for this fluid is equivalent to approximately 8000 bbl/d.
Maximus Model of Single
Well Tieback to Fixed Platform